This post is still a WIP so there might be some missing items!

Welcome to our Home!

IMG_6001

View a video tour of our house before we moved in here.

 

Front Entrance

Before
Entrance1

Current
Entry01

To Do

  • Move shoes
  • Add rug
  • Hang mirror above console table
  • Paint back of front door (until we replace it)
  • Paint mirror frame
  • Replace Doormat

     
    Posts

  • Decor Ideas
  • Adding Decor

     

    Laundry Room/Mud Room

     
    Before

    LaundryRoom01

    Current

    MudRoom09

    To Do

  • Move Washer and Dryer to basement
  • Paint walls
  • Install curtains
  • Cute/Hem Curtains
  • Install beadboard
  • Build/buy bench
  • Build shelves
  • Install coat rack and shoe tray
  • Buy shoe cabinet
  •  
    Posts

  • Organizing the Laundry
  • Operation Mud Room
  • Mud Room Blues
  • The Thinset Debacle
  •  

    Dining Room

    Before

    DiningRoom01

    Current

    Curtains06

    To Do

  • Replace ugly chandeleir – done!
  • Hang something on walls
  • Replace blinds with curtains
  • Add rug
  • Replace chairs

     
    Posts

  • The new cabinet
  • New Curtains

     

    Living Room

    Before

    Current

    To Do

  • Add new couch sectional
  • Hang picture Gallery
  • Replace blinds with curtains
  • Add side tables
  • Replace table with large ottoman
  • Resurface fireplace?
  • Replace rug

     
    Posts

  • Gallery Wall

     

    Computer/Craft Room

    Before

    Current
    CR02

    CR03

    CR04

     
    To Do

  • Fix/replace closet doors
  • Get craft/sewing table
  • Maybe build a built in bookcase against back wall
  • Replace blinds with curtains
  • Paint inside closet

     
    Posts

  • Painting the Room
  • Plans for the Room

     

    Master Bedroom

    Before

    MBB4

    Current

    MBU1
    MBU3

    To Do

  • Re-arrange furniture
  • Paint Closet Doors
  • Add art/pictures to walls
  • Install remote-control celing fan

     
    Posts

  • Bedroom update
  • Painting the dresser
     

    Guest Bedroom

     

    Main Bathroom

    Current
    Bathroom01

    To Do

  • Replace the door & molding
  • Add new towels/bath mat
  • Replace blinds?
     

    Posts

  • Organizing the bathroom

     

    Basement

    Before

    B2

    Current

    B3

    To Do

    • Finish wallpaper liner. We just have all the little awkward parts to do
    • Second coat of primer on bottom half of walls (1/2 of room) & ducts
    • Paint bottom half of walls white (hopefully one coat)
    • Paint top half blue (two coats)
    • Fix/replace lights (half don’t work)
    • Create bartop seating/shelving between poles to separate room Not doing this
    • Carpet
    • Furnish! (New couch sectional, Entertainment stand under TV, Wall Shelving & apparently a ping pong table according to Zack)
    • Cover up electric box
    •  
      Posts

    • Basement Progress – covering the wood panelling
    • Update – Painted walls
    • Carpet!
    •  

      Share